Culvert installation into running streambed

08, Jul. 2024

 

Culvert installation into running streambed

INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

For more Culvert Pipesinformation, please contact us. We will provide professional answers.

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!

  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
Join Us!

*Eng-Tips's functionality depends on members receiving . By joining you are opting in to receive .

Posting Guidelines



Students Click Here

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Eng-Tips Posting Policies

Contact US

thread158- Forum Search FAQs Links MVPs
  • Forum

  • Search

  • FAQs

  • Links

  • MVPs

Culvert installation into running streambed

Culvert installation into running streambed

rogerrogers

(Computer)

(OP)

25 Feb 09 15:21

We would like to install a culvert in a running streambed, in order to provide better access to a back lot on a farm.

The stream is small, I don't know flow rates, etc, but I would say it is 2 inches deep, 18" wide, at the most. The flow rate doesn't appear to change dramatically, even after large rains, as the stream originates not far from where we need to cross and isn't fed by a major run-off.

The creek bed is somewhat marshy, with really solid soil starting about 5' on either side. This is the best point for crossing, otherwise we'd try to find a place with drier surrounds.

With that context, we are curious to know what we should do to stabilize the creek bed prior to installing the culvert. The culvert size we are planning to install is 36". Should we put a certain kind of gravel in? Should we install the culvert parallel to the stream and then divert the stream to flow through the culvert, giving us a drier working area? Should we surround the culvert with gravel, or just backfill with soil from the vicinity? How much soil should we cover the culvert with in order to cross the culvert with heavy farm equipment, including excavators?

Any advice is greatly appreciated, as this is a DIY project and we don't have much experience.

RE: Culvert installation into running streambed

civilperson

(Structural)

25 Feb 09 15:31

What material is the 36" culvert made of?  If reinforced concrete pipe is used and the wall strength is similar to Type 3, then dig down 18" below the flowline of the creek and place 6" to 12" of sand/gravel for a base.  Place the pipe lengths, (width of road plus 9' for slope), and fill to the top of the pipe.  A foot of well compacted fill, (original soil), above the top of culvert and then a 4" gravel road should suffice.  Head walls can shorten the required length of pipe culvert and extra fill on top of the culvert can allow substituting CMP for the culvert.

RE: Culvert installation into running streambed

rogerrogers

(Computer)

(OP)

26 Feb 09 08:45

Thanks for your response!

The culvert is metal, so we'll add extra fill over the pipe. Also, how much lower than the stream should the metal pipe be inserted? Would it still be 18" below the flowline?

RE: Culvert installation into running streambed

rconner

(Civil/Environmental)

26 Feb 09 10:22

With your topography and hydrology/flow conditions, will this have to be a "siphon"?

RE: Culvert installation into running streambed

rogerrogers

(Computer)

(OP)

26 Feb 09 11:47

Can you explain more about what you mean by "will this be a siphon?", at least in this context. Do you mean drain the water out first?

We are currently planning to dig a new trench for the culvert and then redirect the stream through it, once installed, so that we aren't working in the mud.

RE: Culvert installation into running streambed

fattdad

(Geotechnical)

26 Feb 09 12:31

f-d

Not to rain on your parade, but you likely need a permit to do this work. Streams are protected just like wetlands and your state environmental agency and/or the Corps of Engineers may be involved. Also, you may face the need for mitigation for the impacted section of stream/wetlands, which can get expensive!f-d

¡papá gordo ain't no madre flaca!

RE: Culvert installation into running streambed

rconner

(Civil/Environmental)

26 Feb 09 13:49

I guess I originally misunderstood what you meant (I now understand better that you are just wanting to build an access in effect ROAD "crossing" to bridge over a stream, which means the stream basically WILL flow through the culvert you are talking about!)  

RE: Culvert installation into running streambed

cvg

(Civil/Environmental)

26 Feb 09 16:30

recommend the culvert should be installed at the same level as the existing stream. If you lower it, it may just fill in with sediment anyway. However, if you are using a 36" culvert to cross an 18" wide stream, you could bury the culvert below grade and still handle the runoff. What kind of traffic will be crossing the culvert? Nobody has asked this question which is quite important to know what the live loading is on a shallow culvert. If you intend to drive over this with heavier equipment, trucks, tractors etc you may want to increase the depth of fill over the top as well as to use a good quality material for the fill. 12" of native and 4" of gravel as suggested may be fine for light auto traffic, assuming that your native material is decent. But will not be suitable for heavier traffic.

RE: Culvert installation into running streambed

Drumchaser

(Civil/Environmental)

26 Feb 09 20:43

I concur with cvg and civilperson for the most part.

36" CMP (corrigated metal pipe) is what I am picturing to be used to provide a crossing over a running stream.

RCP would be better if your loads are sizeable.  I would (temp.)divert the stream (or temp. dam if poss.) place 3"-6" inch aggr., and walk it down if possible, to accomodate the btm. of the new pipe (FL) to be at or below your existing creek btm. (install pipe in existing creek bed)
The large aggr. has worked well in the past for single and multiple RCP's.

I would not expect you to encounter Environmental issues (USACE, regulatory agencies, or otherwise) unless you are performimg this work for someone other than a private individual. You should however stabilize (perenial vegetation) all fill materials exposed to the stream.

If you are subject to environmental scrutiny, backfill the pipe with non-erodible material (aggregate) up to a point above the area(s) that are in contact with the stream then begin normal fill operations. The stream is considered waters of the US, however regulatory agencies (at least around here) do not "usually" approach folks on their own property.
Sounds like you are in a rural area.
Sloped ends are nice additions to this type of crossing.

Happy Trails

RE: Culvert installation into running streambed

fattdad

(Geotechnical)

27 Feb 09 08:34

I don't make the laws, but they can bother a project like this just as easily as a big commercial job.

f-d

Your environmental exposure has more to do with any downstream neighbors that may notice turbidity in their portion of the stream during this work. If they react (i.e., call the regulator), you will have an issue on your hands. It doesn't matter whether you are working on your land or not!I don't make the laws, but they can bother a project like this just as easily as a big commercial job.f-d

¡papá gordo ain't no madre flaca!

RE: Culvert installation into running streambed

rogerrogers

(Computer)

(OP)

27 Feb 09 08:50

Thanks everyone for your responses. Much appreciated!

We are in a rural area and have looked into the rules re: stream crossings. It seems that agricultural purposes end up incurring much more lenient rules than residential, so hopefully we will be ok by the law.

Re: the crossing weight. Most of the time the culvert will be crossed with pickup trucks and tractors, however, we are hoping to also be able to cross with excavators, which can get very heavy; though this would be rare. We've already purchased the pipe and put it in the streambed, but have not backfilled yet. Is the combination of our crossing load requirements and metal pipe not feasible? Must we use concrete pipe? Can we mitigate the weight issue by adding more fill on top? What sort of material should be used for backfill/over the top in order to provide the most strength?

Thanks again.

RE: Culvert installation into running streambed

Hoagie

(Civil/Environmental)

27 Feb 09 09:23

Fattdad mentioned that USACE will need to be involved, I believe the permit you need is a Nationwide #39.

Regarding mitigation, if the creek is considered habitat or supports fish life, you may want to consider adding a course of streambed material along the flow line of the culvert. This will require to oversize the culvert and install it deeper so you can match the existing flowline. Contact your local fish-and-game office to learn more.



RE: Culvert installation into running streambed

rogerrogers

(Computer)

(OP)

27 Feb 09 09:53

Thanks for the feedback re: permits. We are looking into this more on your advice.

RE: Culvert installation into running streambed

cvg

(Civil/Environmental)

27 Feb 09 10:40

there is nothing wrong with corrugated metal pipe, even for large equipment. however, you will need to make sure you do a good job compacting around the haunches of the pipe, use a good quality structural backfill (not the muck that you pulled out of the stream), and then additional fill over the top of the culvert to spread the load better. Expect that the culvert may deflect when you cross it with the larger vehicles. For backfill and fill material, I would use DOT grade, crushed aggregate road base material.  

RE: Culvert installation into running streambed

rogerrogers

(Computer)

(OP)

27 Feb 09 11:52

cvg: By "good quality structural backfill", do you mean we need to use crushed aggregate, or good quality soil? We had planned to transfer soil from an area nearby, but that is in good shape (not marshy/muddy soil). I thought that the fill, near the haunches, should not be crushed aggregate (though that had been my first idea)?

We do plan to put a good top layer of crushed aggregate.

RE: Culvert installation into running streambed

cvg

(Civil/Environmental)

27 Feb 09 12:07

I don't know what your soil conditions are, maybe your native soils are good. But native soils are rarely as good as road base which is probably what I would specify if I was designing this culvert for one of my clients. For additional strength with heavy loads, I would use a flowable concrete backfill. For flexible pipe installation such as your steel pipe, the backfill and compaction is an essential part of the installation.  If you skimp on this, you may eventually need to replace the pipe when it fails.

RE: Culvert installation into running streambed

rogerrogers

(Computer)

(OP)

27 Feb 09 12:32

Could you describe what good soil would be? We have two kinds, a red, clay-like, soil, and a brown topsoil. We were planning to use the red soil.

RE: Culvert installation into running streambed

rogerrogers

(Computer)

(OP)

27 Feb 09 12:38

If we go with road base, should we use it all the way up the culvert, from the current streambed level, or start higher up the culvert's side?

Thanks again for your feedback.

RE: Culvert installation into running streambed

civilperson

(Structural)

27 Feb 09 14:05

Either of your soil types will work if placed in thin level layers and compacted.  Use 4-6" lifts and ram with the end of a two by four or rent a jumping jack tamper.  The portion of the pipe resting on the grade needs support so excavate the trench to match the bottom third of the pipe.  Keep the moisture of the fill damp enough to hold in a clump after squeezing.

RE: Culvert installation into running streambed

cvg

(Civil/Environmental)

27 Feb 09 14:34


http://www.contech-cpi.com/media/assets/asset/file_name//Installation_Manual_NCSPA.pdf

 

try this for some basic information.

RE: Culvert installation into running streambed

rogerrogers

(Computer)

(OP)

27 Feb 09 15:13

That's a great document; thanks for the link.

RE: Culvert installation into running streambed

Drumchaser

(Civil/Environmental)

Are you interested in learning more about Culvert Pipe Coupler? Contact us today to secure an expert consultation!

27 Feb 09 19:56

yes  fatdad

If this work is upstream from some folks who like to call regulatory agencies perhaps rogerrogers may get some company.

But surely placing a CMP in to cross a stream would not warrant corps involvement, "mitigation", Individual Permit. Come on.

If farmers got the agencies involved everytime they put a cross pipe in it would be a little bit ridiculous, wouldn't it?






 

RE: Culvert installation into running streambed

acivguy

(Civil/Environmental)

28 Feb 09 19:43

I agree with cvg, use a good road grade backfill up to the haunches, well tamped into place. I use HDPE ("plastic") pipe under parking lots with truck loadings all the time, I specify that they throughly tamp the haunches. Agricultural activites are exempt from many wetlands / permitting requirements, especially if the upstream drainage area is minimal. Just put it in and stabilize everything as quickly as possible.  

RE: Culvert installation into running streambed

RWF

(Civil/Environmental)

28 Feb 09 19:52

Be sure to repaint your yellow backhoe changing it to green. Then you will be be engaged in agriculture, NOT in construction.

RE: Culvert installation into running streambed

fattdad

(Geotechnical)

1 Mar 09 20:54

Quote:

But surely placing a CMP in to cross a stream would not warrant corps involvement, "mitigation", Individual Permit. Come on.


Not so harsh please.  We don't know what state the OP is in, we don't have any drawings, the idea of a stream crossing for an excavator and multiple culverts may imply something that has some width and there could be associated wetlands in the riparian buffer.  Then again, I may be incorrect.  I brought up the topic, but it doesn't feel right to be seemingly discredited.  You can take any position you want and it's fine with me.

Regarding the pipe backfill:  The service load from trucks, excavators and the like are not supported by the pipe, per se.  There is load transferred to the pipe and for the pipe to deform the soil on the sides of the pipe has to yield.  Folks have already mentioned that the intimate contact of the compacted backfill below the spring line is critical.  So, if you don't have a stable subgrade and muddy conditions at or below the haunches, you'll be inviting problems.  Another consideration is the amount of soil fill above the top of the pipe.  Several feet being much better than several inches and such.

Regarding agricultural work v. commercial work - not sure of the distinctions in the eyes of the local environmental agencies and the US Corps of Engineers.  If permitting is required there may be some state permit or nationwide permit to assist (i.e., simplify).

Good luck.

f-d

Not so harsh please. We don't know what state the OP is in, we don't have any drawings, the idea of a stream crossing for an excavator and multiple culverts may imply something that has some width and there could be associated wetlands in the riparian buffer. Then again, I may be incorrect. I brought up the topic, but it doesn't feel right to be seemingly discredited. You can take any position you want and it's fine with me.Regarding the pipe backfill: The service load from trucks, excavators and the like are not supported by the pipe, per se. There is load transferred to the pipe and for the pipe to deform the soil on the sides of the pipe has to yield. Folks have already mentioned that the intimate contact of the compacted backfill below the spring line is critical. So, if you don't have a stable subgrade and muddy conditions at or below the haunches, you'll be inviting problems. Another consideration is the amount of soil fill above the top of the pipe. Several feet being much better than several inches and such.Regarding agricultural work v. commercial work - not sure of the distinctions in the eyes of the local environmental agencies and the US Corps of Engineers. If permitting is required there may be some state permit or nationwide permit to assist (i.e., simplify).Good luck.f-d

¡papá gordo ain't no madre flaca!

RE: Culvert installation into running streambed

Drumchaser

(Civil/Environmental)

2 Mar 09 08:04

My apologies sir, I should have included an emoticon. My intentions were non-malicious, but rather directed at my frustration towards the current regulatory agency process.

You are absolutely correct in directing the OP to local and federal guidelines regarding any construction that affects Waters of the U.S.  Hoagie mentioned a USACE nationwide 39; a nationwide 14 may be better suited for this work with regard to Notification requirements.   

Further more, you are also correct in stating the obvious about the unknown location of proposed culvert installment. Many states have more stringent rules about this type of work due to unique and apparent circumstances, which certainly is germane to this application.

The last 20 years I have witnessed large sums of money spent to satisfy someones interpretation of EPA guidelines.



 

fat dadMy apologies sir, I should have included an emoticon. My intentions were non-malicious, but rather directed at my frustration towards the current regulatory agency process.You are absolutely correct in directing the OP to local and federal guidelines regarding any construction that affects Waters of the U.S. Hoagie mentioned a USACE nationwide 39; a nationwide 14 may be better suited for this work with regard to Notification requirements.Further more, you are also correct in stating the obvious about the unknown location of proposed culvert installment. Many states have more stringent rules about this type of work due to unique and apparent circumstances, which certainly is germane to this application.The last 20 years I have witnessed large sums of money spent to satisfy someones interpretation of EPA guidelines.

RE: Culvert installation into running streambed

fattdad

(Geotechnical)

2 Mar 09 09:09

OP:  There's some good stuff to consider on this thread.  Hope it all helps and your project works out great!

f-d

Drumchaser: thanks for the reply - hope I wasn't too touchy, but cyberland is so different from real life, eh?OP: There's some good stuff to consider on this thread. Hope it all helps and your project works out great!f-d

¡papá gordo ain't no madre flaca!

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.


Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members! Already a Member? Login



News


Any good "rule of thumb" for dirt amount over culvert?

You are logged in as a guest. ( logon

Any good "rule of thumb" for dirt amount over culvert?

4WD

Posted 9/11/ 12:14 (#)
Subject: Any good "rule of thumb" for dirt amount over culvert?



Between Omaha and Des Moines, 7 miles South of I80

Say 16" culvert  , and 24" culvert, and 30" culvert?

Is double wall plastic culverts amounts of dirt needed different that 14 ga. steel culvert? (of same size)

Any good websites? (I did run across, a State of Florida, pdf file, that mentioned 12" top cover for concrete, 15" for steel, and 18" for plastic) Does that sound about right?

 

The only heavy items, over these culverts, will be tractor and bushhog, and loader tractor carrying a possible tree truck, from dead tree removal. (only pasture and timber area = little too steep to farm = its always been pasture area, since great granddad)

 

Thanks

Cliff SEIA

Posted 9/11/ 12:21 (# - in reply to #)
Subject: RE: Any good "rule of thumb" for dirt amount over culvert?



For single wall plastic tile I was told 2.5x the tile diameter, for dual wall tile or metal I think it would be less. Oliver1

Posted 9/11/ 12:49 (# - in reply to #)
Subject: RE: Any good "rule of thumb" for dirt amount over culvert?




Alton, Ia

Alton, Ia

I have a field driveway thru a shallow road ditch, county INSISTED there be a culvert there instead of just a gentle valley in the driveway. Have maybe 2" of cover over a corrugated metal pipe, prob 18" dia. Manure tankers, semi's, wagons etc. have not crushed it yet. G man

Posted 9/11/ 13:07 (# - in reply to #)
Subject: RE: Any good "rule of thumb" for dirt amount over culvert?



Southwestern IL St. Clair Co.

Cover over pipe is to help spread the load before it hits the pipe. I'd say for dual wall you need at least 12" and most publication will say minimum of 24" or more. Some times this isn't achievable. One thing you can always do to help your self if you lack cover over the pipe, is backfill around the culvert with gravel (with fines) or sand. Compact this in layers 6" or less each. The backfill around the pipe is what supports the pipe laterally when it wants to push out from loading on the top. This backfill around the pipe often means more about how the pipe will hold up long term then the material type. Most people overlook this aspect. With the loads you have mentioned, I wouldn't be afraid of using dual wall pipe with 12" of cover, as long as you bed and backfill around the pipe with good packing fill. boutbrok

Posted 9/11/ 13:21 (# - in reply to #)
Subject: RE: Any good "rule of thumb" for dirt amount over culvert?



NE Ga

18" corrugated metal pipe carrying small pond runaround. Put few inches of dirt on when installed, but cows use and weather eroded most of that covering several year ago. Cross it with 100 hp tractor, smaller equipment, pick ups several times a year and a D6 Cat occasionally with no damage to pipe. Trint

Posted 9/11/ 13:24 (# - in reply to #)
Subject: RE: Any good "rule of thumb" for dirt amount over culvert?




North Central OH

North Central OH

Normal recommendation for plastic is around 2', 1' is permissible if proper stone is used. Had a pipe company give me a copy of ASTM Designation: F449-02 for reference at a farm show. The 16" may not require that much cover and anything over 48" the requirements change. Joe Dirt

Posted 9/11/ 13:33 (# - in reply to #)
Subject: RE: Any good "rule of thumb" for dirt amount over culvert?



Wisconsin

The town put in a new steel 10 or 12" a couple of years ago to one of my fields. top of that one has been exposed since the first month after they put it in. Been driven over with some heavy loads and hasn't hurt it yet. (yeah, I know...)


I've got a 12" single wall plastic culvert crossing a water runway between 2 fields here that has about 6 inches of rock on top of it and has held up to the same loads as the exposed steel one the town put it. (silage trucks, manure spreaders, loads of round bales) The trick seems to be DON'T drive over it until/unless it's been packed good. Then it will hold alot! rosiesdad

Posted 9/11/ 14:08 (# - in reply to #)
Subject: RE: Any good "rule of thumb" for dirt amount over culvert?




Western-Central Lower Michigan

Western-Central Lower Michigan

Joe Dirt - 9/11/ 13:33

The town put in a new steel 10 or 12" a couple of years ago to one of my fields. top of that one has been exposed since the first month after they put it in. Been driven over with some heavy loads and hasn't hurt it yet. (yeah, I know...)


I've got a 12" single wall plastic culvert crossing a water runway between 2 fields here that has about 6 inches of rock on top of it and has held up to the same loads as the exposed steel one the town put it. (silage trucks, manure spreaders, loads of round bales) The trick seems to be DON'T drive over it until/unless it's been packed good. Then it will hold alot!



Ive a single wall 10" for a field culvert. Sileage trucks and LARGE manure spreader beat on this a LOT. Its only got 6-8" cover and is holding great.
I wouldnt advise driving heavy loads on a plastic culvert unless you pack it well first. slowzuki

Posted 9/11/ 17:17 (# - in reply to #)
Subject: RE: Any good "rule of thumb" for dirt amount over culvert?



New Brunswick, Canada

Depends on the fill. Neighbour has a half exposed steel one, I ran a JD120 escavator over it this spring and it held, just a little flatter on top.



4WD - 9/11/ 12:14

Say 16" culvert  , and 24" culvert, and 30" culvert?

Is double wall plastic culverts amounts of dirt needed different that 14 ga. steel culvert? (of same size)

Any good websites? (I did run across, a State of Florida, pdf file, that mentioned 12" top cover for concrete, 15" for steel, and 18" for plastic) Does that sound about right?

 

The only heavy items, over these culverts, will be tractor and bushhog, and loader tractor carrying a possible tree truck, from dead tree removal. (only pasture and timber area = little too steep to farm = its always been pasture area, since great granddad)

 

Thanks

4WD

Posted 9/11/ 19:42 (# - in reply to #)
Subject: RE: Any good "rule of thumb" for dirt amount over culvert?



Between Omaha and Des Moines, 7 miles South of I80

I did watch a few videos, before I posted this thread; and they showed using small gravel with fines to "bed" the culvert.(just as you mentioned)

I guess, I better get some loads of gravel coming.

 

This afternoon, I measured two used culverts(Dad had behind an old building), both 24" x 20 ft. One is really nice, solid thick metal, smooth inside and out; other is typical corrugated metal (It's a little rough).

 

Reason , I'm interesting in doing this quickly, is I have the tile crew coming to add tile, to drain some big sidehill seeps, in feedlot area above this pasture area.(in 7-10 days)

 So I was hoping their good backhoe operator, could drive down and extra 150 yards and shape the dirt, in each ditch a little (25 feet or so), where the two culverts and gravel will go.(it's too steep on both sides, for me to do anything with a 2wd tractor and loader). Plus it is still wet, in the very center, so I can't drive straight up the ditch/gully, either. We've got old concrete chunks, old concrete blocks, and silo staves for both ends, once culverts get set. Pretty sure I can get at least 12"-15" over each culvert.

In hindsight, I should have done this in , it was totally dry, that Summer.

 

Thanks to everyone for your help/suggestions.

JDPlowboy

Posted 9/11/ 20:32 (# - in reply to #)
Subject: RE: Any good "rule of thumb" for dirt amount over culvert?



sw MN

30" over dual wall.

Culvert about15" 

Ben D, N CA

Posted 9/11/ 21:09 (# - in reply to #)
Subject: RE: Any good "rule of thumb" for dirt amount over culvert?




Whiskey, Tango, Foxtrot

Whiskey, Tango, Foxtrot

Contact us to discuss your requirements of Corrugated Metal Pipe Installation Guide. Our experienced sales team can help you identify the options that best suit your needs.

Once the ground is packed they will hold more than you'd think. No way is a tractor going to collapse it. The irrigation district here has replaced a lot of open canals with 30-60" dual wall. Miles of it. In many places the top of the culvert is exposed at road crossings or along the edges of fields. I farm right up to a 48" line on a field edge, and usually I turn the tractor around on top of the pipe, with little or no cover. No problems. See loaded trucks driving over it hauling out of fields as well.

Only thing I really dislike about using it for culverts is how easily it burns. I usually burn all of my grain stubble fields, all of the field edges and ditchbanks, and you have to be really careful around it. Don't ask me how I know.