What is the rule of thumb for sheet piles?

06, May. 2024

 

Rule of thumb for Estimating Sheet Pile Length ...

INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

For more information, please visit Vinyl sheet pile.

Contact US

FIRST NAME

*


LAST NAME

*


EMAIL

*


MESSAGE

*


ADDITIONAL DETAILS

Thanks. We have received your request and will respond promptly.

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!

  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
Join Us!

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines



Students Click Here

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Eng-Tips Posting Policies

Contact US

thread255-395355 Forum Search FAQs Links MVPs
  • Forum

  • Search

  • FAQs

  • Links

  • MVPs

Rule of thumb for Estimating Sheet Pile Length for Cantilevered and Anchored Sheet Pile Lenghts

Rule of thumb for Estimating Sheet Pile Length for Cantilevered and Anchored Sheet Pile Lenghts

CWEngineer

(Civil/Environmental)

(OP)

23 Sep 15 17:23

I am trying to figure out if there is a rule of thumb for estimating the length of a sheet pile that is cantilevered and anchored. Also, is there a particular reference that this discusses this.

Thanks

RE: Rule of thumb for Estimating Sheet Pile Length for Cantilevered and Anchored Sheet Pile Lenghts

Guest262653

(Geotechnical)

23 Sep 15 20:13

My initial guesses for embedment depths are around the following numbers:
Cantilevered: 2 * Retained Height (i.e. length = 3 * retained height)
Anchored: 1* Retained Height (i.e length = 2 * retained height)

Hope it helps.

RE: Rule of thumb for Estimating Sheet Pile Length for Cantilevered and Anchored Sheet Pile Lenghts

BridgeEI

(Structural)

23 Sep 15 20:14

The rule for cantilevered sheet piling I use is 1/3 above and 2/3 below. I don't know of a rule for anchored, I think it's more dependent on the location you anchor which could depend on a variety of factors. I'm sure someone has a much better answer for you.

Avscorreia beat me to it.

RE: Rule of thumb for Estimating Sheet Pile Length for Cantilevered and Anchored Sheet Pile Lenghts

SlideRuleEra

(Structural)

23 Sep 15 20:52

Cantilevered: "Penetration below the bottom should equal approximately the unsupported height above."

Anchored: Penetration below the bottom should equal between 20% to 75% of the distance from the tie rod to the bottom. Percentage determined by judgment of soil conditions and depth of channel (for waterfront structures).

You can read the exact wording and proper context from the 24th page of "US Steel Sheet Piling Design Extracts", located on my website:
http://www.slideruleera.net/Steel-Piling.html

From a historical viewpoint, by the 1930's steel sheet pile had been in use for several decades. Therefore, there was significant experience with what worked and what did not. At that time, Carnegie-Illinois Steel (a predecessor to US Steel) published "experienced" based guidelines that can be summarized as follows:Cantilevered: "Penetration below the bottom should equal approximately the unsupported height above."Anchored: Penetration below the bottom should equal between 20% to 75% of the distance from the tie rod to the bottom. Percentage determined by judgment of soil conditions and depth of channel (for waterfront structures).You can read the exact wording and proper context from the 24th page of "US Steel Sheet Piling Design Extracts", located on my website:

www.SlideRuleEra.net
www.VacuumTubeEra.net

RE: Rule of thumb for Estimating Sheet Pile Length for Cantilevered and Anchored Sheet Pile Lenghts

Ron

(Structural)

30 Sep 15 00:10

SRE...making us all look like amateurs again!!....but much appreciated! U da man!

RE: Rule of thumb for Estimating Sheet Pile Length for Cantilevered and Anchored Sheet Pile Lenghts

SlideRuleEra

(Structural)

30 Sep 15 00:25

Thanks, Ron. I'm just glad a few questions come up where an answer can be found in the past.

www.SlideRuleEra.net
www.VacuumTubeEra.net

RE: Rule of thumb for Estimating Sheet Pile Length for Cantilevered and Anchored Sheet Pile Lenghts

Guest262653

(Geotechnical)

30 Sep 15 15:58

I've created a simple spreadsheet for the calculation of penetration depths for cantilever walls and did a quick parametric study, varying friction angle and getting D/H ratios. If someone is interested, it can be found at the following link:

https://www.dropbox.com/s/fyj2ue8jfmqysct/CantRetW...

Thanks for the info, SRE. My guess for cantilever walls is for a safety factor of 2.0 on Rankine passive pressures and using the simplified fixed earth support method. For lower safety factors and different earth pressure coefficient calculation methods, these embedment depths fall quite drastically.I've created a simple spreadsheet for the calculation of penetration depths for cantilever walls and did a quick parametric study, varying friction angle and getting D/H ratios. If someone is interested, it can be found at the following link:

RE: Rule of thumb for Estimating Sheet Pile Length for Cantilevered and Anchored Sheet Pile Lenghts

CWEngineer

(Civil/Environmental)

(OP)

2 Oct 15 20:41

Thank you, really appreciate your help. Do you guys know if there is a similar rule of thumb for shoring (soldier piles - H-piles with wood lagging)? Thanks

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.


Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members! Already a Member? Login



News


FRP Sheet Pile Walls – Webinar Q&A

Fiber Reinforced Polymer (FRP) materials provide the ideal technology for seawalls and retaining wall sheet piling system. The FRP sheet piles have 20 years of successful history as you can see on the SuperLoc® product page with data sheets and case studies.

We appreciate all the people who attended our recent webinar on Sheet Pile Wall Systems. If you would like a link to the webinar recording, send an email to Corey Sechler at csechler@pultrude.com.

Many people posed questions that we answered during the webinar. We want to share those answers with those who were not able to attend. 

1.  Like the LRFD capacity is based on Pultrusion LRFD, what are the ASD moment capacity calculations based on?

1. Like the LRFD capacity is based on Pultrusion LRFD, what are the ASD moment capacity calculations based on?

If you want to learn more, please visit our website cooling tower from china manufacturer.

Characteristic Design strengths per ASTM D7290 with the applied reduction strength and reduction factors for moisture uptake.

2.  What are all the factors that need to be applied for ASD moment capacity to compare it against the demand load

2. What are all the factors that need to be applied for ASD moment capacity to compare it against the demand load

Our allowable stress moment capacities have already been factored for Characteristic design strengths and strength and stiffness reduction for moisture uptake. You only need to apply the safety factor. Which typically ranges from 2 - 2.5.

3. What about creep stress?

3. What about creep stress?

Creep is addressed via a Time effect factor in the properties.

4.

What is the capacity of sheet pile in lateral direction?  The concern with twisting of sheeting when driving.

4.

Sheets can twist during installation. Typically, contractors build templates to properly hold the sheet during installation and avoid twisting / mitigate. Contact me at csechler@pultrude.com for videos


Based on the stress-strain curve, composite materials do not exhibit a yield, they would be considered as a brittle material. However, because of their low modulus, members in bending will deflect significantly prior to failure, so visually speaking you CAN identify a problem prior to failure.

6. 

I saw this FRP have been used as wing walls in bridge approach slab; How compaction with rollers affect the stability of wall after the fact?

6.

That wall was installed over 10 years ago. No noticeable issues have been seen after installation

7.  Can be sheet piles be used as sidewalls when building dikes? How about seepage through the material from groundwater in the embankment of the dike?

Sheet pile can be utilized as sidewalls for dikes, in regard to seepage through the walls, there are many interlock sealants that can be utilized (i.e. Wadit, or Alchemy Spetec….)

8.  After locking together, do the sheets act homogenous bulk structure?

8. After locking together, do the sheets act homogenous bulk structure?

We analyze as a single sheet/beam.

9.  Can you please send us the presentation! I need more time to study properties for design purposes.

9. Can you please send us the presentation! I need more time to study properties for design purposes.

We will add a link to our website and a link to the webinar is below. You can email me at csechler@pultrude.com


Yes, the sheet can be used as long as you use the calculations to adequately deal with the moments. Typically, FRP is not used for temporary shoring installations.

 

 

11.  Can you comment on penetration issues with cohesive soils?
Send us additional information at csechler@pultrude.com

12.  What kind of connection do you go with usually? If so bolting, can you do adhesive connection as well? Any plasma welding?

Bolted connections are used.

13. What are limitations when driving piles in gravel area?

When the blow count of the soil is greater than 20, then we suggest a soil review. General if the N>20, then we may recommend pretrenching the area, or utilizing a mandrel system.

14.  Do you have any experience with the project to build a 100% watertight cut-off wall in ecologically threatened area, e.g. landfills with dangerous chemicals?

There are many interlock sealants that can be utilized (i.e. Wadit, orAlchemy Spetec….)


15. What is the longest length possible for the FRP sheet pile? We are looking for something that is roughly 50' long.

Typically, 60' for sheet pile, but we can produce length up to 100' or longer.

 

 

 

16. Thanks! Can we install a sheet pile that is 18' exposed, 34' embedded? Also, can these piles be submersed in ocean water?
Yes, we generally see a rule of thumb is 1/2 in, 1/2 out, but depending upon soil conditions you may need 2/3 in and 1/2 out.
The FRP piling material is not degraded by ocean water.

17.  What is a rough preliminary planning unit cost per linear foot of sheet pile?

17. What is a rough preliminary planning unit cost per linear foot of sheet pile?

Contact me at csechler@pultrude.com

18.  How does water absorption affect properties? 

18. How does water absorption affect properties?

Water absorption decreases the long-term strength and stiffness and we apply the appropriate reduction factors. This is a small reduction in properties.  See literature.

19.  Is that guide specification on your site?

19. Is that guide specification on your site?

​Yes, it is available on the SuperLoc webpage.

20.  How does FRP Sheet Pile stack up in "LEED" Design standards for points to help in achieving a standard?
It does not contribute to the LEED scoring.  FRP is still a sustainable material as it requires less energy to manufacture and it lasts twice as long as steel, concrete, and wood.

 

21.  Can you discuss how the piles and sheeting are tested for UV Radiation degradation?

21. Can you discuss how the piles and sheeting are tested for UV Radiation degradation?

Send me an email reminder and I will email the white paper to you.

22.  Do the amount of light absorbers and UV inhibitors vary from batch to batch or is it consistent with every pile/sheeting manufacturing?

22. Do the amount of light absorbers and UV inhibitors vary from batch to batch or is it consistent with every pile/sheeting manufacturing?

It is within our QC standards and mix standards +/-.

23.  How are the sheet locked together? And the failure mode?

23. How are the sheet locked together? And the failure mode?

Standard interlock just like steel sheet pile.  The failure mode is local compression buckling of the flange is typically how a composite sheet pile fails. They act more as independent beams versus a diaphragm action. There is minimal transverse stress.

24.  You said 3 layers of UV protection but only mentioned 2, UV inhibitors and synthetic veils, what is the third component?

24. You said 3 layers of UV protection but only mentioned 2, UV inhibitors and synthetic veils, what is the third component?

Chemistry light absorbers, inhibitors, and veils.

Contact us!

Learn more about SuperLoc®

Contact us to discuss your requirements of 316 stainless steel water tank. Our experienced sales team can help you identify the options that best suit your needs.