Permit(s) needed for a Concrete Batch Plant

You may need all or some of the following permits:

If you are looking for more details, kindly visit batching plant specification.

 If your industry produces concrete, you may need a Concrete Batch Plant GP | Learn More >

If your industry produces crushed stone, you may need a Crushing and Screening Plant GP | 

Learn More >

 

If you have hot mix asphalt, you may need a Hot Mix Asphalt Plants GP | 

Learn More >

 

If you have a boiler + generator, you may need an Air Quality Individual Permit | 

Learn More >

If your industry has stormwater discharges due to construction, you may need an AZPDES GP Associated with Construction Activity (Stormwater) | Learn More >

1.04 GP: Discharge from a Facility that Receives Water from a Well if Discharge is to the Same Aquifer: “Type 1 General Permit: No notification is required, however, best management practices (BMPs) must be followed.”

 

1.05 GP: Discharge of Backwash or Condensate if less than 1000 Gallons Per Day: “Type 1 General Permit: No notification is required, however, best management practices (BMPs) must be followed.”

 

1.08 GP: Toilet or Privy: “Type 1 General Permit: No notification is required, however, best management practices (BMPs) must be followed.”

 

1.12 GP: Discharge of Wastewater Resulting from Washing Concrete from Trucks, Pumps, and Ancillary Equipment: “Type 1 General Permit: No notification is required, however, best management practices (BMPs) must be followed.”

 

2.01 GP: Drywells that Drain Areas with Hazardous Substances | 

Learn More >

 

2.03 GP: Hydrologic Tracer Studies | 

Learn More >

 

Want more information on dry mix batching plant? Feel free to contact us.

3.01 GP: Lined Impoundments | 

Learn More >

 

3.03 GP: Vehicle and Equipment Washes | 

Learn More >

3.05 GP: Disposal Wetlands | Learn More >

3.07 GP: Tertiary Treatment Wetlands | 

Learn More >

 

If you discharge water pollutants, you may need an Individual APP | 

Learn More >

 

If you temporarily need to discharge water pollutants, you may need a Temporary Individual APP | 

Learn More >

 

If you have a drywell, you may need a Drywell Registration | 

Learn More >

 

If your industry has stormwater discharges due to mining, then you may need an AZPDES MSGP Mining Permit | 

Learn More >

 

If your industry has stormwater discharges, you may need an AZPDES MSGP Industrial Stormwater or No Exposure Certification | 

Learn More >

Concrete Batching Plants

Concrete batching plants use equipment to produce concrete and concrete products by batching or mixing cements and other materials. Equipment used at a concrete batching plant includes silos, weigh hoppers (batchers), conveyors, mixer engines and auxiliary generators.

Concrete batching plants are eligible to operate in Florida under the terms of an air general permit (AGP) pursuant to the requirements of Rule 62-210.310(5)(b), Florida Administrative Code (F.A.C.). 

An AGP is an authorization by rule to construct or operate a specific type of air pollutant emitting facility.  Use of such authorization by any individual facility does not require action by the Florida Department of Environmental Protection (DEP).  The terms and conditions of an AGP are set forth in the rule, rather than in a separately issued air construction or air operation permit.

Registration

You can register, renew, change ownership or make administrative corrections to AGPs online.

If you do not wish to use AGPERS, you can optionally download and complete the following worksheet and mail it to DEP at the address indicated in the worksheet instructions along with the $100 processing fee.

Concrete batching plants registered as relocatable facilities are required to complete a Facility Relocation Notification Form and submit it to the appropriate compliance authority each time they relocate to a new site. These relocation notifications can now be done online in the Department’s Business Portal. To access the online process, go to the Business Portal (http://www.fldepportal.com/go/home) and sign in (or register if you’re a new user) from the link in the upper right corner of the page. From the Welcome page, select the Submit option, then select Registration/Notification, and then click on Air General Permit Relocation Notification. Once in the process, just carefully read the instructions on each screen (and under the Help tabs) to complete the relocation notification.

Compliance Assistance Information

For more information on AGPs or assistance with using AGPERS, please contact DEP’s Small Business Environmental Assistance Program at 1-800-722-7457.

For questions related to compliance procedures such as test notifications, report submittals, record keeping, inspections, etc., please contact the compliance authority specific to the county where your facility is located. If it’s located in Broward, Duval, Hillsborough, Miami-Dade, Orange, Palm Beach, Pinellas or Sarasota counties, visit our Local Program Air Contacts page. For all other counties, go to our District Air Contacts page.