How to Save Money When Buying groove pipe

09, Sep. 2024

 

Gruvlok Advanced Copper Method

In responce to UA22.

The Gruvlok ACM I believe would be proprietary. For those that may not know the ACM, basically it flares out the end of the pipe to IPS size and puts the groove in it at the same time. I am under the impression by doing this you can save money on couplings as it was cheaper to cast IPS size vs CTS. I believe I checked into this a few years back, and as an example a 2" IPS size coupling was roughly $8 and a 2" CTS was roughly $20 the larger it is the more it costs. With this in mind you work for a company that does $150m+/year you can imagine a large project using a thousand couplings could potentially save thousands of dollars.

Another bit of information ill throw out there, is the Gruvlok CTS couplings will work on a vic groove. The groove dimensions and tolerances on the pipe are the same. In a pinch I actually used a vic coupling on a gruvlok groove.

In responce to Gettinit

Dave is the contact that I have been dealing with on this issue. I do have a meeting set up with him, to talk over things for the future of my system. In the research I have done on this subject, plus in speaking with some major plumbing contractors. This is not a popular method, and pretty much no one handles service for this. I really needed to throw the questions out there to the fine professionals on this forum, to see if there was anyone out there that has experience with this, and if there were potential issues I could face in the future, aside from soon to be lack of support.

I definately would not have installed such a system. I really cant believe that out of all the approved joining methods that was in the project manuals this one was chosen. Im not the engineer or the contractor just the poor :jester: that has to deal with it.

JIANZHI supply professional and honest service.

 

Joining HDPE with Victaulic Saves Time, Money

Posted on June 28,

Victaulic's System Solution for High-Density Polyethylene (HDPE) proved to be key in the ahead-of-schedule completion of buried heating and cooling water piping at the Four Seasons' new Residences at Napa Valley. Not your everyday hotel, the Calistoga, California property includes individual farmhouse-style villas designed to maximize the experience of California wine country.

 

The Blueprint

The multiple-building layout of the Residences at Napa Valley property required underground HDPE lines for cooling and heating water distribution, which run from a central utility plant to each residence throughout the property.  Both insulated and non-insulated pipes were used in horizontal and vertical orientations for the 5,000 foot HDPE portion of the project and Victaulic® solutions, including fittings, couplings, and mechanical tees, were installed throughout the project in 2, 4, 6, and 8-inch sizes.

 

The Install

Contractor Greenberry Industrial of Vacaville, California chose to use Victaulic's products based on time and cost savings. Without Victaulic's HDPE technology, Greenberry would have added over 75% more labor for the installation of the HDPE systems. Less labor resulted in cost savings and a shortened project timeline. As an added bonus, Greenberry retained the ability to make pipe length changes onsite and enjoyed the confidence that comes with Victaulic's 'bolt pad-to-bolt pad' visual confirmation of correct installation. With less labor needed, Greenberry was able to reallocate workers to advance other portions of the project, allowing for reburial of the water lines and the pouring of building slabs ahead of schedule.

If you want to learn more, please visit our website groove pipe.

 

Victaulic's technology makes HDPE pipe extremely easy to work with. The pipe can be joined very quickly and with minimal labor, resulting in huge savings. We are excited for future projects where we can use HDPE and Victaulic.

Jared Goodreau
Construction Manager, Greenberry Industrial

 

The Verdict

More design engineers and contractors are turning to HDPE for major piping projects. By using the simple, durable, and designed-to-be-buried Victaulic system, contractors can bypass the limitations of fusion and move forward on schedule regardless of weather. Without Victaulic's solutions, installation of the Four Seasons project's water distribution system would have consumed significantly more time and money. The demonstrated superiority of Victaulic's mechanical solutions for HDPE on this job proves that Victaulic's System Solution for HDPE Pipe is THE joining system for all 'four' seasons.

 

To learn more about Victaulic's System Solution for HDPE Pipe performance, click here.

For more y pipe connectorinformation, please contact us. We will provide professional answers.